This project at the TA Centre in Northampton is a project that we have completed for the Ministry of Defence.

It included major excavations and drainage works including an interceptor and drainage channels.

The surfacing was both Tarmacadam and Block Paving.

The line marking is all done in Block Paving for effect and to demark the walkways.

Contact Us

We're not around right now. But you can send us an email and we'll get back to you, asap.

Not readable? Change text. captcha txt